Manufacturing Software

Plan, Schedule, And Execute Manufacturing With Precision

63 PURCHASE REQUISITION Total Records Today 23 PURCHASE ORDER Total Records Today 18 PO CONFIRMATION Total Records Today 46 PURCHASE INVOICE Total Records Today 15 PURCHASE CREDIT NOTE Total Records Today * Includes Only Transactions Dated Today TOTAL PO CURRENT MONTH SGD 128,500.00 LAST MONTH SGD 98,400.00 100.00 % VENDOR PO DELIVERY INDEX TOTAL PO : 208 PO ON TIME : 157 NO OF LATE PO : 51 AVG LATE DAYS : 28 PO On Time 75.48%
Collaborate With Us

AI-Driven Manufacturing Software In Singapore

Globe3 Manufacturing Software optimizes shop floor operations with real-time shop floor tracking, precision material control, and advanced analytics, driving factory efficiency and shaping the future of production.

Connected

Connected

Bridge shop floor operators, inventory logs, and executive management.

Dynamic

Dynamic

Monitor work orders, machine output, and material flow as events unfold.

Exact

Exact

Keep assembly lines on schedule, limit material waste, and control unit costs.

Dedicated

Dedicated

Partnering with you from raw material allocation to final distribution.

KEY FEATURES

Optimized Output. Minimal Scrap. Lean Shopfloor.

Project Planning & WBS
Resource & Cost Tracking
Risk & Issue Management
Production Scheduling

Production Scheduling

Align master demand with line capacity to ensure smooth production runs.

BOM

Bill of Materials (BOM)

Track multi-level BOMs and routing processes for precise component tracking.

Material Requirements

Material Requirements

Forecast raw material needs accurately to prevent stock shortages and downtime.

Job Order Dispatch

Job Order Dispatch

Enforce shopfloor quality checks to reduce rework and improve overall yield rates.

CORE BENEFITS

Empower Smart Manufacturing from Shop
Floor to Financials

Project Costing & WIP

Project Costing
& WIP

The software tracks job order costs, calculates real-time WIP valuations, and controls shop floor expenditures instantly.

check Live WIP cost tracking
check Detailed variance analysis
check Direct integration with shop floor logs
Shop Floor Visibility

Shop Floor
Visibility

The software transforms production oversight by centralizing real-time data on machine performance and work order status into an intuitive dashboard.

check Live line dashboards
check Data-driven yield forecasting
check Machine uptime monitoring
On-Time Delivery & Quality

On-Time Delivery
& Quality

The software simplifies shop-floor management by centralizing work order execution, batch tracking, and dispatch planning into a single interface.

check Reliable order dispatch
check Accurate batch tracking
check Higher client trust
Material & Inventory Control

Material &
Inventory Control

The software maximizes profitability and operational efficiency by offering real-time oversight of raw materials, scrap generation, and stock availability.

check Real-time stock visibility
check Reduced scrap and waste
check Optimized material use
Testimonials

What Do They Say About Us

Google Rating
4.9
Star Icon Star Icon Star Icon Star Icon Star Icon
STREAMLINING OPERATIONS

How Globe3 ERP Addresses
Manufacturing Challenges

Globe3’s advanced manufacturing solutions help production facilities optimize material planning, reduce production cycle times, and maintain stringent quality controls.

PAIN POINTS
GLOBE3 ERP SOLUTION
PAIN POINTS
cross

Material Shortages & Production Bottlenecks

Inefficient Material Requirements Planning (MRP) leading to sudden raw material shortages that stall production lines or increase rush-shipping costs.

cross

Obscure Floor Costs & Over-reliance on Estimates

Inability to calculate the exact cost of finished goods due to inaccurate tracking of machine downtime, labor hours, and scrap rates.

cross

Poor Traceability & Quality Defects

Difficulty isolating specific defective batches during a quality failure, forcing expensive full-scale product recalls.

GLOBE3 ERP SOLUTION
tick

Dynamic Material Requirements Planning (MRP)

Automatically calculates raw material requirements based on the Bill of Materials (BOM), current stock, and sales forecasts to generate timely purchase orders.

tick

Actual vs. Standard Production Costing

Captures direct labor hours, machine overheads, and material consumption on the factory floor to deliver accurate, item-by-item actual cost analysis.

tick

Strict Forward & Backward Lot Tracking

Enforces strict lot and serial number tracking throughout the production cycle, allowing instant tracing from raw material suppliers to the final customer.

Try Globe3 AI Features Today

Simplify ERP workflows, scale your business instantly.

Need An ERP Solution?

If you have any questions, please do not hesitate to contact us and we will get back to you shortly.

Contact Us